CALGARY, ALBERTA--(Marketwired - April 7, 2015) - Tanager Energy Inc. ("Tanager") (TSX VENTURE:TAN), is pleased to report that it has completed the tie-in of its first of 4 wells at its Joffre project. The well was placed on production on April 1 and after 5 days of monitoring and operating facility adjustments it is now producing at a rate of 118 barrels of oil per day and 250 mcf of natural gas, totaling 160 BOE/D. The well is a flowing oil well with a flowing wellhead pressure of 435 psi.
http://ift.tt/1CuoQaR @MasterMetals MasterMetals Blog
No comments:
Post a Comment
Commented on MasterMetals